Was there a particular project that has left a lasting positive memory in your mind?
Well, yes actually. We started that project roughly eleven years ago. In response to rising market demand for Carabao products, we’d decided to build a new plant incorporating state-of-the-art filling and packaging solutions from Krones. There was one major challenge, though: Space was at a premium.
But Krones found a solution: They planned a two-storey filling hall. However, that was quite tricky because the depalletiser and palletiser were to be installed on the ground floor, with all the other machines accommodated on the floor above. Krones therefore built the depalletiser with 7.2-metre-high columns. Thanks to this innovative design, it was possible to lift the bulk-glass pallets, for example, from the ground floor to the floor above, where layer by layer is then swept off the pallet and fed into the line.
Another project that springs to mind was a canning line upgrade. In this project, Krones checked the configurations and capacities of the individual machines, and that enabled us to increase line output by an impressive 23 per cent, from 60,000 to 73,800 cans per hour, and meet rising market demand. This canning line is meanwhile among those with the highest output for energy drinks. What’s more, we’ve now incorporated Line Management for central coordination of all filling and packaging processes.